About this task
For a detailed description of this topic, please refer to the InfiniBox Best Practices Guide for setting up the replication service.
Before you begin
- You cannot delete an Interface while it is in use
Physical Deployment
- There are two stacked switches available
- A port from each node connects to each switch
- Each of the ports of each node forms an LACP (Link Aggregation Control Protocol) (6 in total)
InfiniBox entities
- There are 1 LACP per switch per node, * 2 switches * 3 nodes = 6 LACPs
- There is an interface per LCAP group
- There are two network spaces, each utilizes all of the interfaces of one of the switches
- There are two services, one per network space
- Only one service serves the replication link
- The other service is in stand-by
Comments